The permit desk works from Ordinance 2026-07 and Permit Desk Intake Procedure, version 3, effective 1 April 2026. The 2025 fence counter handout is superseded.

Public notice · Ordinance 2026-07, section 4.2

Posted

Fence permits now start at six feet

The Board of Supervisors adopted Ordinance 2026-07 in March 2026. Under section 4.2, a residential fence or wall six feet or higher needs a permit before work starts, including the replacement of an existing backyard fence.

This replaces the seven-foot line printed in the 2025 residential fence counter handout. That handout is superseded. If you kept a copy, bring it to the counter: staff will show you the section that replaced it and mark your copy superseded.

Corner lots also keep a 25-foot sight triangle along each street frontage under section 4.5. A fence inside that triangle needs a planning review even when it is lower than six feet.

In forceTamarack County Ordinance 2026-07: Fences, Walls and Accessory Structures (as amended March 2026)

ReplacesResidential Fence Permits - Counter Handout (2025 edition, superseded)

A couple at the wooden permit counter leaning over a site sketch and a tape measure while a clerk points to a section in the ordinance binder
At the permit desk, the ordinance binder stays open to the section that decides the question.

The rules

What the ordinance asks

Section 4.2

Fence height

A permit at six feet or higher, measured from the finished ground beside the fence to its highest point. Decorative panels count toward the height.

Section 4.5

Corner lots

A 25-foot sight triangle along each street frontage. A replacement fence must satisfy the visibility rule as well as the height line.

Intake version 3

Before you build

Bring the property address, a site sketch showing the boundary, height and any street corner, and how you want us to contact you. An incomplete sketch comes back with a written list of what is missing.

Fees, FY2026

Fees, FY2026
Residential fence permit$85
Deck permit$140
Re-roof permit$120
Plan check, where required$110 per hour

A receipt confirms payment, not permission to build. If you withdraw before plan check starts and ask within 30 days, 80% of the permit fee is refunded.

A mother, father and daughter measuring a new cedar fence post in the backyard of their corner-lot house

From the counter

The Ferreira family fence on Birch Street

The Ferreiras came to the counter in April with the 2025 handout from their kitchen drawer. They wanted to replace a sagging backyard fence with a six-foot cedar one on their corner lot. Delia opened Ordinance 2026-07 at section 4.2, showed them the 6-foot line and the date it took effect, then checked section 4.5 because the fence turned the corner. They left with the fence form, an $85 fee and a site sketch to finish, and the permit was issued before the posts went in.

Who you will meet

The permit desk team

Permits are issued from the counter on the ground floor of the county courthouse, Main Street, Cedar Ford.

Delia Okafor, permit desk clerk, at the counter of the Tamarack County permit desk

Permit desk

Delia Okafor

Permit Desk Clerk, Planning & Building

Delia Okafor has worked the counter through the change from the 2025 handout to the new ordinance. She holds the county's permit desk certification on the updated procedure.

Rosa Delgado, permit technician, Tamarack County

Permit desk

Rosa Delgado

Permit Technician

Reviews applications and fee calculations, and follows up with residents.

Marcus Hale, Planning & Building Director, Tamarack County

Planning & Building

Marcus Hale

Planning & Building Director

Owns the permit procedures and signs off when a procedure is adopted.

Wen Zhao, accessibility and digital services coordinator, Tamarack County

Accessibility & digital services

Wen Zhao

Accessibility & Digital Services Coordinator

Arranges large print, audio copies, read-aloud and interpreter requests.

Where this is written

  • Tamarack County Ordinance 2026-07: Fences, Walls and Accessory Structures (as amended March 2026)
  • Residential Fence Permits - Counter Handout (2025 edition, superseded)
  • Permit Desk Intake Procedure, version 3 (effective 1 April 2026)
  • Building Permit Fee Schedule FY2026
  • Permit Desk Return and Refund of Fees Procedure

Fictional documents in the county demo workspace. Titles identify the procedure; this site does not accept applications or records requests.

Next

Every permit becomes a file the county keeps. Here is how to ask for one.

Records