What does a building permit cost in Tamarack County, and what does the receipt mean?

The FY2026 fee schedule lists four figures residents meet most: $85 for a fence, $140 for a deck, $120 for a re-roof and $110 per hour for plan check. The receipt you get for any of them confirms payment, not permission to build.

Under the Building Permit Fee Schedule FY2026, the over-the-counter residential fence permit fee is $85, a deck permit is $140, a re-roof permit is $120, and plan-check work, where required, is charged at $110 per hour. The desk states the category before taking payment, because a fence is not charged as a deck just because both appear on the same sketch. A receipt confirms payment only. It is not approval and not permission to start construction. The issued permit arrives after intake and review are complete.

Delia Okafor · Permit Desk Clerk, Planning & Building · · 4 min read

Last updated

What are the published fees?

The FY2026 schedule is short, and these are the lines residents ask about:

  • Residential fence permit, over the counter: $85
  • Deck permit: $140
  • Re-roof permit: $120
  • Plan-check work, where that review is required: $110 per hour

Section 1 of the schedule says the applicable category must be stated before payment is taken. If your sketch shows a fence and a deck, you are charged for each item under its own category, not for one at the other's rate.

What does the desk record when I pay?

Section 2 of the schedule lists it: the case reference, the fee category, the amount, the payment date and the receipt identifier, all in the permit record. If plan check may apply, the desk explains that estimate separately and explains the basis for the additional review. The desk does not promise an hourly total before the review hours have been determined. Asking me for one is fair; the honest answer is that the procedure does not let me guess.

Why does the receipt not mean I can start?

Section 3 of the schedule says it plainly: a receipt confirms payment, not approval or permission to start construction. Ordinance 2026-07 says the same thing in section 6 for fence permits specifically. Staff must explain that paying a fee does not authorise work until the permit is issued.

The reason is sequence. Payment happens at intake. Review happens after intake. The permit is issued when intake and review requirements are satisfied. A receipt sits at the first step. Starting construction on the strength of it means building before anyone has checked the sketch against the ordinance.

What if I only want to know whether I need a permit?

Ask. That question costs nothing, and the answer comes with the source: section 4.2 of Ordinance 2026-07 for height, section 4.5 for a corner lot. You pay a fee when you apply, not when you ask.

How does the fee connect to the ordinance?

The ordinance and the fee schedule are separate documents that point at each other. Section 6 of Ordinance 2026-07 names the $85 over-the-counter fence fee under the FY2026 schedule. The schedule carries the figure and the payment rules. When you ask the desk what a fence permit costs, the answer should name both: the fee from the schedule and the permit requirement from the ordinance, each with its section and date.

What if I withdraw after paying?

Section 4 of the schedule refers you to the Permit Desk Return and Refund of Fees Procedure. In short: a refund request made within 30 days of withdrawal qualifies for review, and before plan check starts the refundable share is 80 percent of the permit fee. The desk explains which condition applies to your case and keeps the original receipt with the refund decision. Once plan check has started, the case goes to a documented review of work already performed rather than a fixed percentage. The refund procedure has its own article on this site.

Why so much emphasis on what a receipt is not?

Because the misunderstanding is common and expensive. A resident who reads a receipt as approval can have posts in the ground before a corner-lot review has happened. The desk's job is to make the sequence clear before money changes hands: category, amount, receipt, then review, then permit.

What should I check on my receipt?

Five things, matching what the desk records: the case reference, the fee category, the amount, the payment date and the receipt identifier. If the category says deck and you applied for a fence, say so before you leave the counter. The receipt and the permit record should agree, because the receipt is the document that follows the file for 10 years after the final permit action under the Records Retention Schedule, and it is the document a refund decision is built on if you later withdraw.

Can I pay before my sketch is complete?

The desk will not take a fee for an application it is returning. An incomplete sketch comes back with a written list of the missing details, and no payment is recorded until the intake requirements are met. That sequence keeps the receipt honest: it only ever confirms a payment on an application the desk has accepted.

Q&A

The questions people ask about permit fees and receipts are answered below.

Last updated 1 October 2026.

Questions and answers

What does a residential fence permit cost?
$85 over the counter under the FY2026 fee schedule, which Ordinance 2026-07 section 6 also names.
Is a receipt the same as a permit?
No. A receipt confirms payment. The issued permit, which comes after intake and review are satisfied, is what authorises construction.
Will the desk tell me the total plan-check cost up front?
The desk explains that plan check is $110 per hour where required and explains the basis for the review, but does not promise an hourly total before the review hours have been determined.
Can a fence be charged at the deck rate?
No. The desk states the applicable category before taking payment; a fence is $85 and a deck is $140, each under its own line.

#fees #FY2026 fee schedule #receipts #permits

Fees

Can I get a refund if I withdraw a permit application?

Partly, and the conditions are written down. A refund request within 30 days of withdrawal, before plan check starts, returns 80 percent of the permit fee. After plan check starts, the case goes to a documented review instead.

Delia Okafor · Permit Desk Clerk, Planning & Building · · 4 min read

Permits

Do I need a permit for a six-foot fence in Tamarack County?

Yes. Since March 2026 a residential fence six feet or higher needs a permit under Ordinance 2026-07, section 4.2, and that includes replacing the fence you already have. Here is what the section says, how to measure, and what to bring to the counter.